Actualités

Monde

Actualités Audio

Fews App News List List des news

US put nearly $500M into critical artillary plant that still hasn’t produced a single round: watchdog

New York Post Fews App News Provider
Fews App Post Time ha 22h

An artillery plant that the US spent $469 million on has failed to produce any of the critical 155mm rounds America needs in the two years since it was built, according to a Pentagon watchdog report. General Dynamics Ordnance and Tactical Systems (GDOTS) opened the plant in Mesquite, Texas, in May 2024 as part of a government contract to refill America’s ammunition that was sent to Ukraine. The plant, however, has not produced any metal projectile parts outlined in the contract, putting at risk America’s ability to meet its 155mm production goal, the Defense Department inspector general found.

Aller á la Source
Nouvelles connexes
Fews App Loading
S'identifier
Facebook Login
Twitter Login
Google Plus Login
Merci pour votre inscription à notre Newsletter
Votre email a déjà été ajouté à notre liste d'abonnés
Email invalide